A+ CATEGORY SCIENTIFIC UNIT

A new branch and bound algorithm for project scheduling with resource constraints

Volume 21 / 1991

G. Scheithauer, J. Terno Applicationes Mathematicae 21 (1991), 273-282 DOI: 10.4064/am-21-2-273-282

Authors

  • G. Scheithauer
  • J. Terno

Search for IMPAN publications

Query phrase too short. Type at least 4 characters.

Rewrite code from the image

Reload image

Reload image